Strengthening of Forests Through Groundwater Restoration

SHARE

Summary & Objectives

Grand Bahama relies on groundwater as its drinking water source for the island’s population. The majority (60%) of the drinking water supplied to the island historically originated from an area named Wellfield 6, a private area located to the northeast of Freeport. This wellfield is protected by a forest. However, the storm surge that accompanied Hurricane Dorian caused approximately 21 feet of saltwater to sit above Wellfield 6 for several days, resulting in contamination of the freshwater lens, in addition to the widespread mortality of the pine forests in this area. Ths project will focus on the mapping and delineation of the extent of damage to the landscape, as well as groundwater modeling and will include development of a plan for reforestation of damaged areas through direct seeding and seedling planting, creation of GIS mapping and diagnostics of the study site and characterization of hydrologic processes (quantity and quality) in the area. It will also include a list of potential recovery efforts for the freshwater lens that can be made with managed aquifer recharge and other management alternatives.

Project Details

Start Date

End Date

Project Duration

Implementation Status

Source of Funding

CBF Funding

Total Funding

Project Resources

The resources for this project will be available soon.

Other project details

Target Countries

Grantees

Forestry Unit – Ministry of Environment (FU)

National Conservation Trust Fund (NCTF)

Bahamas Protected Areas Fund

CBF Projects Database

After over a decade of providing sustainable financing for the Caribbean region, the CBF has directly or indirectly funded an estimated 100 projects and initiatives that implement effective conservation actions. This database provides details of those projects.